Files
zclaw_openfang/skills/.playbooks/phase-5-launch.md
iven d64903ba21 feat(skills): complete multi-agent collaboration framework
## Skills Ecosystem (60+ Skills)
- Engineering: 7 skills (ai-engineer, backend-architect, etc.)
- Testing: 8 skills (reality-checker, evidence-collector, etc.)
- Support: 6 skills (support-responder, analytics-reporter, etc.)
- Design: 7 skills (ux-architect, brand-guardian, etc.)
- Product: 3 skills (sprint-prioritizer, trend-researcher, etc.)
- Marketing: 4+ skills (growth-hacker, content-creator, etc.)
- PM: 5 skills (studio-producer, project-shepherd, etc.)
- Spatial: 6 skills (visionos-spatial-engineer, etc.)
- Specialized: 6 skills (agents-orchestrator, etc.)

## Collaboration Framework
- Coordination protocols (handoff-templates, agent-activation)
- 7-phase playbooks (Discovery → Operate)
- Standardized skill template for consistency

## Quality Improvements
- Each skill now includes: Identity, Mission, Workflow, Deliverable Format
- Collaboration triggers define when to invoke other agents
- Success metrics provide measurable quality standards

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-15 03:07:31 +08:00

4.0 KiB

Phase 5: Launch Playbook

发布阶段 - 部署、验证、发布后监控


阶段目标

安全部署系统到生产环境,执行发布计划,确保平稳上线。

输入文档

从 Phase 4 接收:

  1. 性能基准报告
  2. 安全审计报告
  3. 监控配置文档
  4. 无障碍合规报告
  5. 生产就绪清单

激活 Agents

Agent 角色 优先级
DevOps Automator 部署执行 立即
Reality Checker 发布验证 部署后
Infrastructure Maintainer 基础设施监控 部署后
Support Responder 用户支持准备 发布前
Content Creator 发布公告 发布时

发布前检查清单

T-24h: 最终准备

## Pre-Launch Checklist

### 代码冻结
- [ ] 所有 PR 合并
- [ ] Release 分支创建
- [ ] 版本号更新
- [ ] CHANGELOG 更新

### 基础设施
- [ ] 生产环境配置验证
- [ ] SSL 证书检查
- [ ] DNS 配置确认
- [ ] CDN 缓存预热

### 数据库
- [ ] 迁移脚本测试
- [ ] 备份完成
- [ ] 回滚脚本准备

### 第三方服务
- [ ] API 密钥验证
- [ ] Webhook 配置
- [ ] 限流配置

### 团队准备
- [ ] On-call 排班确认
- [ ] 通知渠道测试
- [ ] 回滚流程演练

部署流程

Step 1: 部署到 Staging (T-4h)

# 1. 部署到 Staging
./deploy.sh staging v1.0.0

# 2. 运行烟雾测试
./smoke-test.sh staging

# 3. Reality Checker 验证
# 触发 Reality Checker 进行最终验证

# 4. 如果失败,修复并重试
# 如果成功,继续生产部署

Step 2: 生产部署 (T-0)

# 1. 备份当前版本
./backup.sh production

# 2. 执行部署
./deploy.sh production v1.0.0

# 3. 健康检查
curl https://api.example.com/health

# 4. 烟雾测试
./smoke-test.sh production

# 5. 如果失败,执行回滚
./rollback.sh production

Step 3: 发布后验证 (T+15min)

Reality Checker 执行:

## Post-Launch Verification

### 功能验证
- [ ] 用户注册流程
- [ ] 用户登录流程
- [ ] 核心业务流程
- [ ] 支付流程 (如有)

### 性能验证
- [ ] 页面加载时间
- [ ] API 响应时间
- [ ] 错误率检查

### 监控验证
- [ ] 指标正常收集
- [ ] 告警正常触发
- [ ] 日志正常记录

### 用户验证
- [ ] 无用户投诉
- [ ] 支持工单正常

发布后监控 (T+0 to T+24h)

实时监控 (第一小时)

指标 警告阈值 严重阈值 检查频率
错误率 > 0.5% > 1% 1 分钟
响应时间 > 300ms > 500ms 1 分钟
CPU 使用 > 70% > 85% 1 分钟
内存使用 > 75% > 90% 1 分钟

短期监控 (24 小时)

  • 每小时检查关键指标
  • 监控用户反馈渠道
  • 准备快速响应团队

回滚计划

触发条件

立即回滚如果:

  • 错误率 > 2%
  • 关键功能不可用
  • 数据丢失风险
  • 安全漏洞暴露

回滚步骤

# 1. 宣布回滚
./notify.sh "ROLLBACK INITIATED"

# 2. 执行回滚
./rollback.sh production v0.9.0

# 3. 验证回滚
./smoke-test.sh production

# 4. 通知团队
./notify.sh "ROLLBACK COMPLETE"

发布公告

内部通知

## 🚀 Release v1.0.0

### 发布时间
[时间戳]

### 新功能
- [功能 1]
- [功能 2]

### 修复
- [修复 1]
- [修复 2]

### 已知问题
- [问题 1] - 计划修复: [时间]

### 关键指标
- 部署时间: [时间]
- 烟雾测试: PASS
- 错误率: [当前值]

### On-Call
- 主要: [人员]
- 备用: [人员]

外部公告

Content Creator 准备:

  • 产品更新博客文章
  • 社交媒体公告
  • 用户邮件通知
  • 文档更新

阶段门禁

进入 Phase 6 (Operate) 前:

# 标准 验证方法
1 部署成功 健康检查通过
2 烟雾测试通过 自动化测试
3 监控正常 指标收集验证
4 无 Critical 问题 Issue 追踪
5 用户反馈正常 支持渠道监控

预计时间: 1-2 天 下一阶段: Phase 6 - Operate